rapid excavation and stability control of deep roadways for an underground coal mine with high production in inner mongolia

คลิก: 316
รหัส: 210961
2018
คุณภาพบทความและตัวชี้วัดประสิทธิภาพ
คุณภาพโดยรวม
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
การประเมินคุณภาพโดย AI
ยังไม่ได้วิเคราะห์
Readership in this journal
Steady

Ranked #120 of 935 articles by views in journal of physics: conference series

Most read Least read

Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 935 in total.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
บทคัดย่อ
For large underground coal mines producing 10 million tons a year, rapid excavation and stability of deep roadways are pivotal to ensure sustainable, safe, and efficient production. This paper provides a case study of Hulusu Coal Mine in Inner Mongolia, where roadway excavation speed was insufficient to meet production needs. Moreover, deformation in the roofs of the roadways was severe. To achieve rapid excavation and control the stability of deep roadways, a new support system was proposed and constructed in a roadway at a depth of 640 m. The system consisted of long flexible bolts pretensioned to high levels and spaced at large intervals. Roadway excavation and construction of a support system were conducted simultaneously. Field measurements indicated that the new support system effectively controlled deformation and fracture development during excavation and mining. Maximum displacements of the roof during excavation and mining were 10 and 30 mm, respectively. The axial load on bolts surged during excavation as a result of slight deformations caused by excavation operations. This active response of the bolts is beneficial to the prevention of roof deformation during excavation and mining. During mining, fissures propagated up to only a depth of 1.4 m into the surrounding rock mass. The new support system formed a thick reinforced anchorage zone, which greatly improved the bearing capacity of the roof. Compared with the previous support system, the new system allowed the maximum excavation speed (31.5 m/day) to increase by 85.3%. This successful case provides a practical reference for similar roadway projects.
คีย์อ้างอิง
xie2018sustainabilityrapid ใช้คีย์นี้เพื่ออ้างอิงอัตโนมัติในต้นฉบับขณะใช้งาน SciMatic Manuscript Manager หรือ Thesis Manager
ผู้เขียน ;Zhengzheng Xie;Nong Zhang;Deyu Qian;Changliang Han;Yanpei An;Yang Wang
วารสาร journal of physics: conference series
ปี 2018
DOI
10.3390/su10041160
URL
คำสำคัญ

การอ้างอิง

ไม่พบการอ้างอิง หากต้องการเพิ่มการอ้างอิง กรุณาติดต่อผู้ดูแลระบบที่ info@scimatic.org

ยังไม่มีความคิดเห็น เป็นคนแรกที่แสดงความคิดเห็นเกี่ยวกับบทความนี้