The application of grey water recycling at Gayanti City Apartment, South Jakarta

Clicks: 207
ID: 87151
2018
Free PDF
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Emerging

Ranked #229 of 300 articles by views in matec web of conferences

Most read Least read

Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 300 in total.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
This planning is aim to design the plumbing system at Gayanti City Apartment with a separate system or grey water recycling system so that the efficiency cost of the recycling system will be known. Clean water system from PAM JAYA DKI and recycle water system from grey water that distributed to Waste Water Treatment Plant (WWTP) to be treated and reused for flushing closet and watering plants are designed for this apartment. The amount of the clean water needed is 116.6 m3/day and the amount of the recycle water needed is 18.64 m3/day. Water supply system that applied to this apartment is roof tank system. Calculation of water consumption's fluctuations to determine the capacity of reservoirs and pumps are using Four Winds Apartment, Bellagio Apartment, Thamrin Residences Apartment, and Karet Kuningan Apartment as a comparison with the same criteria as the designed apartment. The capacity of the clean ground water tank is 123.5 m3 and the recycle ground water tank is 12 m3. Transfer pumps work for 12 hour/day (1 time pause) and the capacity of clean roof water tank is 31.5 m3 and the recycled one is 6.7 m3. Based on the chosen alternative in design, Gayanti City Apartment is using the first water supply system alternative that needs 18 stand pipes of clean water and 18 stands pipes of recycle water with 4 PRVs mounted on each stand pipes and booster pump installed for the top 6 floors. The amount of clean water needed is 116.6 m3/day and recycle water is 18.64 m3/day. Waste water produced is equal to 93.28 m3 which 80% of it is the grey water that will be treated in Waste Water Treatment Plant into recycle water. Total amount of clean and recycled water investment and reservoir constructions is Rp. 1,637,227,201,- and percentage of clean water that can be saved from the application of recycling system is 18% with total efficiency cost Rp 233,932/day or Rp 7,017,960/month.
Reference Key
a2018thematec Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors
Journal matec web of conferences
Year 2018
DOI
DOI not found
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.