Implementation of Risk Management in Manufacturing of Wellhead and Christmas Tree Equipment (Risk management framework)
Clicks: 255
ID: 35176
2018
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Steady Performance
65.9
/100
255 views
208 readers
Trending
AI Quality Assessment
Not analyzed
Readership in this journal
SteadyRanked #138 of 300 articles by views in matec web of conferences
Most read
Least read
Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 300 in total.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
Wellheads and Christmas trees are the main equipment for oil production. They are manufactured in the plant and installed on the casing head to seal the annular space between casing and tubing. They are used to transport oil to pipeline in well field. The loss of wellhead and Christmas tree integrity can result in major accidents, presenting a severe risk to the environment. Therefor a purpose of this study is to investigate of an organization perception for risk management implementation in manufacturing wellhead and Christmas tree equipment. The responses were analysed using SPSS software by using Cronbach’s α, mean-value and standard deviation. Data was collected by posting a Google link form, or sent to the email of the companies listed in the Malaysia and Batam, Indonesia. This quantification of the risk management process and a risk identification tool onto the risk management process framework. The model can support and indicate the contribution of an industrial risk manager towards achieving project objectives, as well as making comprehensive decisions regarding analysis of risk management in manufacturing project and operation.
| Reference Key |
abdul2018implementationmatec
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | Abdul, Hamid;Bin, Baba Ishak;Haji, Hasan Sulaiman Bin;Setyo, Darmawan Agung;Nushatisah, ; |
| Journal | matec web of conferences |
| Year | 2018 |
| DOI |
DOI not found
|
| URL | |
| Keywords | Keywords not found |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.