Will the children use it?-A RE-AIM evaluation of a local public open space intervention involving children from a deprived neighbourhood.

Clicks: 207
ID: 28893
2019
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Popular

Ranked #21 of 31 articles by views in Evaluation and program planning

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
Knowledge on how to improve public open spaces in deprived neighbourhoods to increase active living among children is scarce and comprehensively evaluated public open space interventions are needed. Firstly, the aim was to explore if involving 39 local fifth-grade children (10-11 years old) from a deprived neighbourhood in creating playable installations in a public open space influenced their use of this space. Secondly, we wanted to explore if the Reach, Effectiveness, Adoption, Implementation and Maintenance framework (RE-AIM) was useful for evaluating different stages in the intervention project. RE-AIM was applied through a convergent mixed-methods triangulation design using survey, accelerometer, GPS, and interviews as data sources. Effectiveness outcomes revealed that on average the space was used less by the 39 children after the intervention. The implementation and maintenance dimensions revealed aspects of why most children involved in the project did not use the space after intervention. The evaluation cast light on children's perceptions of their role, and importance of maintenance when the intervention was completed. In future, all dimensions of built environmental projects would benefit from being planned and evaluated in a collaboration with all project partners using an evaluation framework integrated and applied from the beginning of the project.
Reference Key
pawlowski2019willevaluation Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors Pawlowski, Charlotte Skau;Schmidt, Tanja;Nielsen, Jonas Vestergaard;Troelsen, Jens;Schipperijn, Jasper;
Journal Evaluation and program planning
Year 2019
DOI
S0149-7189(18)30340-9
URL
Keywords Keywords not found

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.