decision support model in projects of complex objects protection potential danger
Clicks: 234
ID: 256210
2016
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Steady Performance
30.0
/100
234 views
29 readers
AI Quality Assessment
Not analyzed
Readership in this journal
SteadyRanked #16 of 24 articles by views in journal of wind engineering and industrial aerodynamics
Most read
Least read
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
The article made the simulation of complex technical-organizational systems under conditions of risk, uncertainty and the impact of the turbulence and the model of decision support to assess the safety and operation of complex object level based on fuzzy logic and considered the possibility of using the foundations of fuzzy logic, support decisions taken in the draft protection of objects of potential danger. It was established that the definition of conjunction and disjunction as «max», and «min», respectively, gives great opportunities to minimize the model, and found that when simplified models, there is an opportunity to come to the point where some units "reduced", that is, some nodes are made to the model at the design stage have no impact on the success of the project of protection of objects of potential danger. Proved that the problem to be solved within the framework for building complex object models in design-oriented project management protection facilities need to use the potential danger disjunction and conjunction formally presented in the form of algebraic product and the amount of fuzzy sets, as this does not lead to the loss of nodes and provides conditions that take into account the impact of all input parameters. Considered in terms of advantages and disadvantages of the use of logical operations, as well as the characteristics and properties of the object of potential hazards, to minimize the number of key relationships in the model for optimal project management in assessing and improving the safety of life.
| Reference Key |
2016vsnikdecision
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;Роман Юрійович СУКАЧ;Юрій Павлович РАК |
| Journal | journal of wind engineering and industrial aerodynamics |
| Year | 2016 |
| DOI |
10.20998/2413-3000.2016.1174.22
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.