cost planning in projects of forestry’s production structures optimization

Clicks: 177
ID: 250075
2015
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Steady

Ranked #23 of 24 articles by views in journal of wind engineering and industrial aerodynamics

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
In the research the features of cost planning in the projects for optimization of the for estry enterprises structures (POFES) have been analyzed. Based on the results obtained in the paper the conclusion had made that the incorporation of the defined features of cost planning during the implementation of POFES would ensure the success of each the project.
Reference Key
2015vsnikcost Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Олександр Віталійович ОЛІФЕР
Journal journal of wind engineering and industrial aerodynamics
Year 2015
DOI
10.20998/2413-3000.2014.1046.21
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.