international comparisons of cost and productivity in construction: a bad example
Article Quality & Performance Metrics
Readership in this journal
SteadyRanked #27 of 29 articles by views in journal of foot and ankle research
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
Abstract
In a report published in June 2012 the Business Council of Australia (BCA) reported that it costs considerably more to build a variety of types of infrastructure in Australia than it does in the US. Airports (90% more costly) and hospitals (62%) were quoted as the worst cases with other projects ranging from 26% to 43% more. They used these figures to conclude that Australia is a high cost, low productivity environment for building infrastructure projects. These claims were based on cost/m2 figures published by a major international construction consultancy. The method used by the BCA is flawed in two ways: one is the in the use of costs that are recognised as giving only the broadest of indications of probable costs and the second is the use of exchange rates to convert Australian construction costs to US dollars. Careful analysis of the methodology used, supported by a series of other comparisons based on other data sources and other conversion factors (purchasing power parities or PPPs), suggests that in real terms it probably costs no more to build in Australia than it does in the US and that it may well be cheaper to build in Australia than it is in the US.
| Reference Key |
best2012australasianinternational
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | |
| Journal | journal of foot and ankle research |
| Year | 2012 |
| DOI |
10.5130/ajceb.v12i3.2662
|
| URL | |
| Keywords | Keywords not found |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
ZincirX productsfrom the team behind Journament
-
PatentYazar
Patent drafts for the EPO, USPTO and TürkPatent
From inventor notes to a DOCX draft: description, claims, abstract. The machine drafts, the attorney signs.
See how it works (opens in a new tab) -
Projenator
Have a project idea? Score and plan it with AI
AI scores your idea in five dimensions and builds a phased plan. Your first project is free, no card needed.
Start your first project (opens in a new tab)
Cookies
We use strictly necessary cookies to run the site and keep you signed in. With your permission we would also use Google Analytics to see how the site is used, and Google AdSense to show ads on journal and article pages. Both stay off unless you accept, and you can change your mind at any time. How we use cookies · KVKK notice (Türkiye)
Cookie settings
Comments
No comments yet. Be the first to comment on this article.