cost analysis of continuous flight auger piles construction in egypt
Clicks: 209
ID: 224120
2016
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Steady Performance
30.0
/100
209 views
66 readers
AI Quality Assessment
Not analyzed
Readership in this journal
SteadyRanked #69 of 137 articles by views in PLoS computational biology
Most read
Least read
Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 137 in total.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
Continuous Flight Auger (CFA) piling is widely used in the Egyptian construction industry. There is a dramatic fluctuation in pricing of executing this work package within short periods as a result of unsteady changes in supply-demand equilibrium. Consequently, there is an urgent need for the use of a scientific approach in estimating construction costs. Accordingly, it is crucial to consider the different cost elements of CFA piling construction as a step to reach an accurate and realistic cost estimate to be used by contractors in tendering. This research aims to study these cost elements based on an expert judgment, site observations and statistical analysis in order to develop an effective tool to estimate the total construction cost of the CFA piles in any future project. Expert survey was performed to draw detailed information to construct a cost breakdown structure (CBS) that was used as a basis for developing the proposed cost model. The developed cost model is then validated through the application on fifty two projects. Such projects were carefully selected in different sizes, purposes and locations. Then the collected data were exposed to statistical analysis techniques. An average percentage error of 4.1% was observed upon comparing the estimated costs with the actual costs of these projects. A sensitivity analysis was then performed to recognize the most effective cost factors. The developed recommended model was used by some experienced contractors in the Egyptian market who expressed their satisfaction with the model.
| Reference Key |
hosny2016alexandriacost
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;Hossam E. Hosny;Ahmed H. Ibrahim;Raymond F. Fraig |
| Journal | PLoS computational biology |
| Year | 2016 |
| DOI |
10.1016/j.aej.2016.05.021
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.