decision-making on reverse logistics in the construction industry

Clicks: 229
ID: 221329
2016
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Emerging

Ranked #45 of 95 articles by views in ferroelectrics

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
With the growing competition, many construction organizations attempt to improve their productivity, quality, and efficiency. Construction waste management, by means of reverse logistics, becomes a key issue to improve the productivity, and raise the company’s green image. In this study, four reverse logistics methods-direct reuse, remanufacturing, recycling, and landfill-are considered to manage construction and demolition (C&D) waste. Two factors (economic and site-specific) with their 15 sub-factors affecting the decisions to implement the reverse logistics are examined. The hierarchy model of reverse logistics decisions, developed through the analytic hierarchy process, reveal the importance of the economic factor over the site-specific factor. It is suggested that the transportation cost, the processing cost, the specific sorting technology, and the limited project time must be first considered before making decisions on reverse logistics plans. The construction company can utilize the developed hierarchy model to decide on the most appropriate reverse logistics plan to achieve the best benefits.
Reference Key
chinda2016songklanakarindecision-making Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Thanwadee Chinda;Veeris Ammarapala
Journal ferroelectrics
Year 2016
DOI
DOI not found
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.