an integrated supplier-buyer inventory model with conditionally free shipment under permissible delay in payments

Clicks: 81
ID: 219407
2010
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Popular

Ranked #300 of 631 articles by views in science and technology of advanced materials

Most read Least read

Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 631 in total.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
It is well known that production, distribution, marketing, inventory control, and financing all/each have a positive impact on the performance of a supply chain. Despite the growing interest in the development of integrated inventory models, the interactions between these elements of a supply chain may not be efficiently included, resulting in a restricted supply chain model presentation. To incorporate this phenomenon, a mathematical model that tackles the interdependent relationships between these aforementioned elements is developed in this paper. This study considers the determination of the optimal pricing, ordering, and delivery policies of a profit-maximizing supply chain system, faced with (1) unit wholesale price of the supplier is set based on unit production cost, (2) unit production cost is taken as a function of demand rate and production rate, (3) the supplier's production rate is adjusted according to market demand, (4) market demand depends upon buyer's selling price, (5) a free freight is offered if the buyer's order exceeds a certain minimum requirement, and (6) a constant credit period is offered by the supplier to stimulate the demand of the buyer. Algorithm for computing the optimal policies is derived. The sensitivity of the optimal results with respect to those parameters which directly influence the production and transportation costs is also examined.
Reference Key
su2010abstractan Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Chia-Hsien Su
Journal science and technology of advanced materials
Year 2010
DOI
10.1155/2010/594246
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.