optimisation of cable cross in medium voltage networks of a wind farm

Clicks: 231
ID: 216490
2013
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Steady

Ranked #39 of 98 articles by views in human reproduction (oxford, england)

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
The article presents the results of a comparative analysis of the selection of optimal cable dimensions and internal voltage for a wind farm grid. The analysis was performed for rated grid voltages, 15 kV and 20 kV. It related to the merits of the farm’s MV grid optimisation. The objective function of the calculation algorithm takes into account the energy losses in cable lines of the farm’s MV grid, and the cable lines’ cost.
Reference Key
semkw2013actaoptimisation Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Marek Semków
Journal human reproduction (oxford, england)
Year 2013
DOI
10.12736/issn.2300-3022.2013411
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.