modern methods for cost optimization in transport constructions
Clicks: 272
ID: 207741
2016
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Popular Article
30.0
/100
272 views
33 readers
AI Quality Assessment
Not analyzed
Readership in this journal
PopularRanked #10 of 13 articles by views in African journal of disability
Most read
Least read
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
The paper deals with modern tools, which reduce costs during the traffic infrastructure life cycle. From design, construction, maintenance and operation of the construction work to the end of useful life. New management and organization methods in the construction industry provide more transparent and more realistic information about the cost of the building. One of the possible tools is software based on CAFM and CIFM environments. The use of these tools is predominantly in the operational phase of the construction work. The complex solution brings building information modeling (BIM), which includes the cost of an object from design to disposal.
| Reference Key |
miroslav2016businessmodern
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;Bartos, Miroslav;Urban, Karol;Vitasek, Stanislav |
| Journal | African journal of disability |
| Year | 2016 |
| DOI |
10.14311/bit.2016.02.04
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.