análise de projetos para unidades de conservação, usando lógica fuzzy analysis of projects in conservation units, using fuzzy logic
Article Quality & Performance Metrics
Readership in this journal
SteadyRanked #20 of 61 articles by views in Neotropical entomology
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
Abstract
This work presents a method for projects analyses, which are applying for implantation in Conservation Units, which operates economics, sociology, and ecology indicators by fuzzy logic. Top-down decision trees are structured, where the entries are the primary indicators and each output is the result of logic operations in a block of rules with operators "if", and, or, so". The fuzzy logic was chosen due to its transparency when operating the information, allowing the stakeholders to clearly understand the consequences caused by the decisions made throughout the analysis process. The possibility of implanting a tourist project was considered as object of analysis, in an area that belongs to the state of Santa Catarina, Brazil. The State government has already showed the intention of building a ecological park in such area. The result of the utilization of the method shows that it can show the stakeholders the levels of adequacy of a specific project to the given conditions.
| Reference Key |
medeiros2007productionanlise
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;Sandro Medeiros;Renato de Mello;Pio Campos Filho |
| Journal | Neotropical entomology |
| Year | 2007 |
| DOI |
10.1590/S0103-65132007000200008
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
ZincirX productsfrom the team behind Journament
-
PatentYazar
Patent drafts for the EPO, USPTO and TürkPatent
From inventor notes to a DOCX draft: description, claims, abstract. The machine drafts, the attorney signs.
See how it works (opens in a new tab) -
Projenator
Have a project idea? Score and plan it with AI
AI scores your idea in five dimensions and builds a phased plan. Your first project is free, no card needed.
Start your first project (opens in a new tab)
Cookies
We use strictly necessary cookies to run the site and keep you signed in. With your permission we would also use Google Analytics to see how the site is used, and Google AdSense to show ads on journal and article pages. Both stay off unless you accept, and you can change your mind at any time. How we use cookies · KVKK notice (Türkiye)
Cookie settings
Comments
No comments yet. Be the first to comment on this article.