A hybrid mathematical programming model for optimal project portfolio selection using fuzzy inference system and analytic hierarchy process.
Clicks: 388
ID: 20154
2019
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Popular Article
63.0
/100
388 views
273 readers
Trending
AI Quality Assessment
Not analyzed
Readership in this journal
PopularRanked #7 of 31 articles by views in Evaluation and program planning
Most read
Least read
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
The primary goal in project portfolio management is to select and manage the optimal set of projects that contribute the maximum in business value. However, selecting Information Technology (IT) projects is a difficult task due to the complexities and uncertainties inherent in the strategic-operational nature of the process, and the existence of both quantitative and qualitative criteria. We propose a two-stage process to select an optimal project portfolio with the aim of maximizing project benefits and minimizing project risks. We construct a two-stage hybrid mathematical programming model by integrating Fuzzy Analytic Hierarchy Process (FAHP) with Fuzzy Inference System (FIS). This hybrid framework provides the ability to consider both the quantitative and qualitative criteria while considering budget constraints and project risks. We also present a real-world case study in the cybersecurity industry to exhibit the applicability and demonstrate the efficacy of our proposed method.
| Reference Key |
tavana2019aevaluation
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | Tavana, Madjid;Khosrojerdi, Ghasem;Mina, Hassan;Rahman, Amirah; |
| Journal | Evaluation and program planning |
| Year | 2019 |
| DOI |
S0149-7189(19)30192-2
|
| URL | |
| Keywords | Keywords not found |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.