evaluation of effectiveness of managing construction project realization under the influence of random factors

Clicks: 242
ID: 189075
2017
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Emerging

Ranked #36 of 140 articles by views in PsyCh journal

Most read Least read

Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 140 in total.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
Subject: the article proposes the methods for flexible regulation of administrative and organizational-technical relations between participants of the construction process which are based on integrated management contracts to address the issues related to realization of investment-construction projects in due time and within the funding limit under the influence of random factors. Research objectives: development of a conceptual simulation model of the process of making managerial decisions within the framework of realization of investment-construction project taking into account uncertainty. Materials and methods: We used the principles of the theory of control of technical and manufacturing systems, cybernetics, and also the methods of organizational, logical-semantic and simulation modeling, the works of domestic and foreign scholars on the problem under study. Results: by creating a functional simulation model for realization of investment-construction project, the construction process is considered as an iterative activity that is characterized by a list of indicators describing the state of the project at each control point. Controlled parameters include: planned indicators of the start and end date, and also the cost of execution of works depending on the project realization option (nomenclature of works, material and technical resources, labor intensity, machine capacity). Also, we characterize the basic criteria for efficiency of managerial influence on the realization of construction projects. Conclusions: we substantiated the necessity of taking into account the influence of random factors in the process of realization of investment-construction projects to determine more accurate predictive estimates of cost and duration of construction, especially for objects financed at the expense of state funds and built on the “fixed” contract price.
Reference Key
borisovich2017vestnikevaluation Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Sborshchikov Sergey Borisovich;Shinkareva Galina Nikolaevna;Maslova Lyubov’ Alexandrovna;Leybman Dmitriy Mikhailovich
Journal PsyCh journal
Year 2017
DOI
10.22227/1997-0935.2017.11.1240-1247
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.