back-analysing rock mass modulus from monitoring data of two tunnels in sydney, australia

Clicks: 278
ID: 183499
2017
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Steady

Ranked #20 of 40 articles by views in journal of neurotrauma

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
This paper presents two case studies where the rock mass modulus and in situ stress are estimated from the monitoring data obtained during the construction of underground excavations in Sydney, Australia. The case studies comprise the widening of existing twin road tunnels within Hawkesbury sandstone and the excavation of a large cavern within Ashfield shale. While back-analysis from detailed systematic monitoring has been previously published, this paper presents a relatively simple methodology to derive rock mass modulus and in situ stress from the relatively simple displacement data routinely recorded during tunnelling.
Reference Key
bertuzzi2017journalback-analysing Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Robert Bertuzzi
Journal journal of neurotrauma
Year 2017
DOI
10.1016/j.jrmge.2017.05.005
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.