management of construction time at the restoration of the ostankino tv tower
Clicks: 350
ID: 180051
2015
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Popular Article
30.0
/100
350 views
42 readers
AI Quality Assessment
Not analyzed
Readership in this journal
PopularRanked #8 of 24 articles by views in journal of wind engineering and industrial aerodynamics
Most read
Least read
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
The article presents options for managing construction time at restoration and renovation of the "Ostankino television tower", Moscow, also provides variants of method for optimization construction and installation works. Methodology is based on the construction of the project models in Microsoft Project and their experimental and statistical analysis using software COMPEX. This method is effective in the optimization reconstruction of complex engineering structures.
| Reference Key |
2015vsnikmanagement
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;Михаил Николаевич ЕРШОВ;Александр Иванович МЕНЕЙЛЮК;Лилия Вячеславовна ЛОБАКОВА |
| Journal | journal of wind engineering and industrial aerodynamics |
| Year | 2015 |
| DOI |
10.20998/2413-3000.2015.1111.18
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.