problems in the implementation of the lean concept at a steel works - case study

Clicks: 2
ID: 164990
2018
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Emerging

Ranked #428 of 435 articles by views in acta botânica brasílica

Most read Least read

Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 435 in total.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
The paper presents the experience of implementing selected instruments of the Lean concept at a steel works. The functioning of an enterprises in the currently prevailing conditions, i.e. in a turbulent environment, results in increased customer requirements. They expect, among other things, high quality of steel products delivered on time at a low price. Many organizations decide to implement the lean management concept without proper preparation. The purpose of this paper is to present the limitations occurring during the implementation of the lean management concept in a steel mill.
Reference Key
adrian2018matecproblems Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Maszke Adrian;Dwornicka Renata;Ulewicz Robert
Journal acta botânica brasílica
Year 2018
DOI
10.1051/matecconf/201818301014
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.