surface water floods in switzerland: what insurance claim records tell us about the damage in space and time
Article Quality & Performance Metrics
Readership in this journal
EmergingRanked #20 of 190 articles by views in anziam journal
Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 190 in total.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
Abstract
This study reveals that SWFs are responsible for at least 45 % of the flood damage to buildings and 23 % of the associated direct tangible losses, whereas lower losses per claim are responsible for the lower loss share. The Swiss lowlands are affected more heavily by SWFs than the alpine regions. At the same time, the results show that the damage claims and associated losses are not evenly distributed within each region either. Damage caused by SWFs occurs by far most frequently in summer in almost all regions. The normalized SWF damage of all regions shows no significant upward trend between 1993 and 2013. We conclude that SWFs are in fact a highly relevant process in Switzerland that should receive similar attention like fluvial flood hazards. Moreover, as SWF damage almost always coincides with fluvial flood damage, we suggest considering SWFs, like fluvial floods, as integrated processes of our catchments.
| Reference Key |
bernet2017naturalsurface
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | |
| Journal | anziam journal |
| Year | 2017 |
| DOI |
10.5194/nhess-17-1659-2017
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
ZincirX productsfrom the team behind Journament
-
PatentYazar
Patent drafts for the EPO, USPTO and TürkPatent
From inventor notes to a DOCX draft: description, claims, abstract. The machine drafts, the attorney signs.
See how it works (opens in a new tab) -
Projenator
Have a project idea? Score and plan it with AI
AI scores your idea in five dimensions and builds a phased plan. Your first project is free, no card needed.
Start your first project (opens in a new tab)
Cookies
We use strictly necessary cookies to run the site and keep you signed in. With your permission we would also use Google Analytics to see how the site is used, and Google AdSense to show ads on journal and article pages. Both stay off unless you accept, and you can change your mind at any time. How we use cookies · KVKK notice (Türkiye)
Cookie settings
Comments
No comments yet. Be the first to comment on this article.