research on information models for the construction schedule management based on the ifc standard

Clicks: 130
ID: 154207
2015
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Popular

Ranked #49 of 58 articles by views in research journal of environmental toxicology

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract

Purpose: The purpose of this article is to study the description and extension of the Industry Foundation Classes (IFC) standard in construction schedule management, which achieves the information exchange and sharing among the different information systems and stakeholders, and facilitates the collaborative construction in the construction projects.

Design/methodology/approach: The schedule information processing and coordination are difficult in the complex construction project. Building Information Modeling (BIM) provides the platform for exchanging and sharing information among information systems and stakeholders based on the IFC standard.

Through analyzing the schedule plan, implementing, check and control, the information flow in the schedule management is reflected based on the IDEF. According to the IFC4, the information model for the schedule management is established, which not only includes the each aspect of the schedule management, but also includes the cost management, the resource management, the quality management and the risk management.

Findings: The information requirement for the construction schedule management can be summarized into three aspects: the schedule plan information, the implementing information and the check and control information. The three aspects can be described through the existing and extended entities of IFC4, and the information models are established.

Originality/value: The main contribution of the article is to establish the construction schedule management information model, which achieves the information exchange and share in the construction project, and facilitates the development of the application software to meet the requirements of the construction project.

Reference Key
xue2015journalresearch Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Weirui Xue;Yaowu Wang;Qingpeng Man
Journal research journal of environmental toxicology
Year 2015
DOI
10.3926/jiem.1283
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.