bioseguridad en instalaciones médicas de atención primaria y secundaria biosafety in the primary and secondary health care facilities
Article Quality & Performance Metrics
Readership in this journal
SteadyRanked #13 of 75 articles by views in chemical biology and drug design
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
Abstract
Due to the emergence and reemergence of infectious agents in the last years, a great number of samples of infectious material that may be dangerous for the lab personnel, for other workers, and for the community, are processed daily in the clinical and microbiological labs. That's why, it is important to train the personnel in the biosafety topic, so that those who are exposed know the risks, the protection means they should use, and what to do if an accident occurs. In a survey done among lab workers, it was detected little culture on this topic, and the most frequent accidents were: the spilling of infectious material, the breaking of test tubes with culture, and the pricks with syringe needles. A cascade training, according the level of the workers, including the managers that are the most responsible for the biological safety, is necessary.
| Reference Key |
cueto2007bioseguridad
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;María del Carmen Pérez Cueto;Gladys Antonia Cueto Montoya |
| Journal | chemical biology and drug design |
| Year | 2007 |
| DOI |
DOI not found
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
ZincirX productsfrom the team behind Journament
-
PatentYazar
Patent drafts for the EPO, USPTO and TürkPatent
From inventor notes to a DOCX draft: description, claims, abstract. The machine drafts, the attorney signs.
See how it works (opens in a new tab) -
Projenator
Have a project idea? Score and plan it with AI
AI scores your idea in five dimensions and builds a phased plan. Your first project is free, no card needed.
Start your first project (opens in a new tab)
Cookies
We use strictly necessary cookies to run the site and keep you signed in. With your permission we would also use Google Analytics to see how the site is used, and Google AdSense to show ads on journal and article pages. Both stay off unless you accept, and you can change your mind at any time. How we use cookies · KVKK notice (Türkiye)
Cookie settings
Comments
No comments yet. Be the first to comment on this article.