Modelling and optimization of a natural gas supply system at a transient stage: a case study of China

Clicks: 303
ID: 118983
2019
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Popular

Ranked #14 of 17 articles by views in bmc energy

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
The global energy structure is on a low-carbon transition path featuring more natural gas consumption, and global natural gas demand has been increasing fast. Planning and operation of a natural gas supply system at a transient stage with multiple supply sources, end-consumers, and large infrastructure with multiple sub-systems are challenging tasks. Spatial and seasonal mismatch of natural gas supply and demand makes the natural gas distribution and infrastructure construction planning problem even more complex. Without proper planning, insufficient construction could lead to a shortage of natural gas supply, whilst excessive construction could lead to a higher cost. Quantitative analysis technologies are needed to facilitate decision-making during the transient stage of a natural gas system. In this work, we propose a monthly-scale multi-period and multi-regional modelling and optimization framework for planning and operation of a natural gas supply system at a transient stage, with a case study of the natural gas supply system in China. The optimal planning and operation strategy of the natural gas supply system in China by 2050 is obtained by minimizing the lifespan overall cost. Gaps between actual planning and the optimal planning are pointed out. Finally, policy suggestions are summarized, including establishing market-oriented pricing mechanisms, managing infrastructure centrally, promoting coordination amongst provinces when formulating projections, accelerating current infrastructure construction, and predicting natural gas demand and prices reasonably.
Reference Key
li2019bmcmodelling Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors Tianxiao Li;Pei Liu;Zheng Li;Tianxiao Li;Pei Liu;Zheng Li;
Journal bmc energy
Year 2019
DOI
doi:10.1186/s42500-019-0005-6
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.