The investigation of biological removal of nitrogen and phosphorous from domestic wastewater by inserting anaerobic/anoxic holding tank in the return sludge line of MLE-OSA modified system.

Clicks: 416
ID: 109762
2020
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Emerging

Ranked #6 of 27 articles by views in journal of environmental health science & engineering

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
In this study, the biological removal of nitrogen and phosphorous (BNR) was investigated by applying modified MLE-OSA technique. To conduct this study, three pilot plants scale were designed and established: 1) MLE similar to the current method used in Sari Wastewater Treatment Plant as control reactor 2) MLE-OSA with 4-h hydrolic retention time in sludge holding tank 3) MLE-OSA with 6-h hydrolic retention time in sludge holding tank. In this modified process for combining OSA technique with MLE system, two anaerobic/anoxic tanks were installed in the return sludge line with capacities of 70 and 107 l for MLE-OSA and MLE-OSA respectively. To set up the process, outlet sewage of the primary settlement tank of Sari Wastewater Treatment Plant was used. After a period of 45-60 days and reaching the steady state, the reactors were operated and the main, controllable parameters and laboratory experiments such as DO, ORP, Temperature, pH, COD, BOD, MLSS, and nutrients (N&P) were precisely analyzed according to standard methods for examination of water and wastewater. The results showed that utilizing MLE-OSA system with 4 and 6 h hydraulic retention times decreased the ORP by around 109 ± 9 to 160 ± 25 mv and increased sludge retention time from 29 to 33 days. Moreover the percentages of phosphorus removal efficiency in MLE, MLE-OSA and MLE-OSA processes were 31 ± 5.2, 36.8 ± 1.9, and 39.4 ± 1.9 and the percentages of total nitrogen removal efficiency were 67.2 ± 7.6, 75.6 ± 4.8, and 78.5 ± 2.2 respectively. This study revealed that the modified MLE-OSA is more efficient than MLE for P and N removal. Hence it can replace this process.
Reference Key
nikpour2020thejournal Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors
Journal journal of environmental health science & engineering
Year 2020
DOI
10.1007/s40201-019-00419-1
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.