The use of earned value management for initiating directive project control decisions: a case study
Clicks: 243
ID: 96047
2016
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Steady Performance
30.0
/100
243 views
52 readers
AI Quality Assessment
Not analyzed
Readership in this journal
SteadyRanked #8 of 8 articles by views in south african journal of industrial engineering
Most read
Least read
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
With large infrastructure backlogs in Africa, well-controlled projects will play a significant role in African infrastructure development. In this paper, the monitoring and/or directive use of Earned Value Management (EVM) is investigated and linked to project management maturity. This case study also investigates the use of EVM based on the financial and schedule risk distribution among project role players, and the effect of EVM on project performance. The results show minimal use of EVM in the directive control of projects; at best, the directive use of EVM is found to be implied rather than deliberate and methodical.
| Reference Key |
2016thesouth
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | , Nkiwane, N. H.;G., Meyer, W.;H., Steyn,; |
| Journal | south african journal of industrial engineering |
| Year | 2016 |
| DOI |
DOI not found
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.