Analysis of Rework Risk Triggers in the Nigerian Construction Industry
Clicks: 213
ID: 87897
2018
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Steady Performance
30.0
/100
213 views
48 readers
AI Quality Assessment
Not analyzed
Readership in this journal
SteadyRanked #2 of 2 articles by views in organization, technology and management in construction: an international journal
Most read
Least read
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
The construction industry plays a significant role in the infrastructure development of many countries. Construction projects suffer from a lot of setbacks despite sophistication and advancement in technology and professionalism. This study, therefore, assessed the factors that triggered the emergence of rework and the benefits derived from eliminating such triggers in the Nigerian construction industry. The study adopted a quantitative survey approach in which a structured questionnaire was adopted as the research instrument. Factor analysis using principal component analysis was adopted to determine the factors that triggered the rework and the pattern of relationship that existed amongst the factors; relative importance index (RII) was used to assess the benefits of eliminating rework triggers. The study concluded that the factors that triggered the emergence of rework were omission and planning issues, change issues, funding and communication issues, and poor workers and resource control. Repeat patronage, higher productivity, and reduced delivery time reduced the rework and waste and improved the employee job satisfaction and morale; they were the benefits derived from eliminating rework triggers. It was recommended that there is a need for clarity, effectiveness, and timeliness of instruction and information dissemination amongst project participants and the participation of contractors, subcontractors, and other stakeholders at the design stages to avoid omissions and construction changes
| Reference Key |
chidiebere2018analysisorganization
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | Chidiebere, Eze Emmanuel;Ebhohimen, Idiake John;Olanrewaju, Ganiyu Bashir; |
| Journal | organization, technology and management in construction: an international journal |
| Year | 2018 |
| DOI |
DOI not found
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.