Probabilistic Risk Assessment of the Shipyard Industry using the Bayesian Method

Clicks: 394
ID: 66487
2014
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Popular

Ranked #6 of 15 articles by views in international journal of technology

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
The shipbuilding industry is characterized by high-risk business activities; therefore, caution should be taken in its operational processes. From upstream to downstream, the shipbuilding industry depends on other industries. In this study, a risk assessment was conducted on the construction of new vessels using the Bayesian network approach; accordingly, the risk assessment was carried out using a probabilistic value at risk (VaR). The study was carried out by PT PAL Indonesia in association with the construction of a new tanker ship (building production codes M271 and M272). An analysis was conducted on three main components of new vessel construction—design components, material and production components, and sub-components of the previous two components. From the study, we could conclude that the probability of delay for new vessel construction caused by design delay is 0.05; the probability of delay caused by material delay is 0.65; and the probability of delay caused by production delay is 0.3. For delays caused by design factors, a yard plan is the sub-component that contributes predominantly to delays (i.e., probability of 0.3). For delays caused by material factors, the sub-component with the greatest impact is hull and machinery outfitting, with a probability of 0.3. For delays caused by production factors, the sub-component with the biggest impact is hull construction, with a probability of 0.39. Thus, we could conclude that a project delay would occur if the material component and the hull construction sub-components were not handled properly.
Reference Key
basuki2014probabilisticinternational Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors Basuki, Minto ;Manfaat, Djauhar ;Nugroho, Setyo ;Dinariyana, AAB ;
Journal international journal of technology
Year 2014
DOI
DOI not found
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.