Noise reduction in urban LRT networks by combining track based solutions.
Clicks: 165
ID: 37004
2016
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Popular Article
61.7
/100
165 views
133 readers
Trending
AI Quality Assessment
Not analyzed
Readership in this journal
PopularRanked #605 of 637 articles by views in The Science of the total environment
Most read
Least read
Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 637 in total.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
The overall objective of the Quiet-Track project is to provide step-changing track based noise mitigation and maintenance schemes for railway rolling noise in LRT (Light Rail Transit) networks. WP 4 in particular focuses on the combination of existing track based solutions to yield a global performance of at least 6dB(A). The validation was carried out using a track section in the network of Athens Metro Line 1 with an existing outside concrete slab track (RHEDA track) where high airborne rolling noise was observed. The procedure for the selection of mitigation measures is based on numerical simulations, combining WRNOISE and IMMI software tools for noise prediction with experimental determination of the required track and vehicle parameters (e.g., rail and wheel roughness). The availability of a detailed rolling noise calculation procedure allows for detailed designing of measures and of ranking individual measures. It achieves this by including the modelling of the wheel/rail source intensity and of the noise propagation with the ability to evaluate the effect of modifications at source level (e.g., grinding, rail dampers, wheel dampers, change in resiliency of wheels and/or rail fixation) and of modifications in the propagation path (absorption at the track base, noise barriers, screening). A relevant combination of existing solutions was selected in the function of the simulation results. Three distinct existing solutions were designed in detail aiming at a high rolling noise attenuation and not affecting the normal operation of the metro system: Action 1: implementation of sound absorbing precast elements (panel type) on the track bed, Action 2: implementation of an absorbing noise barrier with a height of 1.10-1.20m above rail level, and Action 3: installation of rail dampers. The selected solutions were implemented on site and the global performance was measured step by step for comparison with simulations.
| Reference Key |
vogiatzis2016noisethe
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | Vogiatzis, Konstantinos;Vanhonacker, Patrick; |
| Journal | The Science of the total environment |
| Year | 2016 |
| DOI |
S0048-9697(15)30117-0
|
| URL | |
| Keywords | Keywords not found |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.