HMA-PPO for Integrated Production and Preventive Maintenance Scheduling in Distributed Flexible Job Shops with Job Arrivals

Clicks: 44
ID: 328895
2026
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Emerging

Ranked #17 of 44 articles by views in journal of computational design and engineering

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
Abstract With the rapid advancement of distributed manufacturing, distributed flexible job shops have become an important production paradigm in high-end equipment manufacturing. However, dynamic job arrivals and preventive maintenance requirements arising from continuous equipment degradation create strong coupling between production scheduling and maintenance decisions, making multi-objective optimization particularly challenging. This study investigates the integrated optimization of production scheduling and preventive maintenance in distributed flexible job shops with dynamic job arrivals, with the objectives of minimizing makespan, total tardiness, and total energy consumption. To solve this problem, a hierarchical multi-agent proximal policy optimization approach, termed HMA-PPO, is proposed. The method establishes a collaborative decision-making framework that involves production agents and maintenance agents, enabling the joint optimization of production scheduling and preventive maintenance. A multi-objective learning mechanism that combines NSGA-II-generated reference solutions with dynamic weights derived from the entropy weight method is further developed to alleviate reward sparsity and improve multi-objective trade-off performance. In addition, a discrete-event simulation environment is developed in FlexSim to model and evaluate the collaborative scheduling process under dynamic job arrivals. Experimental results on generated test instances show that HMA-PPO consistently outperforms PPO, SAC, DDQN, and DQN in terms of convergence quality and Pareto-set diversity, as evaluated using IGD, Nd, C(A,*), and NR.
Reference Key
openalex_W7213331998 Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors
Journal journal of computational design and engineering
Year 2026
DOI
10.1093/jcde/qwag080
URL
Keywords Keywords not found

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.