Un procedimiento de fuerte reducción de las dimensiones del RCPS/Pi
Clicks: 158
ID: 32672
2009
Article Quality & Performance Metrics
Overall Quality
Improving Quality
0.0
/100
Combines engagement data with AI-assessed academic quality
Reader Engagement
Star Article
72.2
/100
156 views
126 readers
Trending
AI Quality Assessment
Not analyzed
Abstract
Recently, in the field of project scheduling problems the concept of partially renewable
resources has been introduced. Theoretically, it is a generalization of both renewable and non-renewable resources. From an applied point of view, partially renewable
resources allow us to model a large variety of situations that do not fit into
classical models, but can be found in real problems in timetabling and labour scheduling.
When modelling real problems, the problem of project scheduling with partially
renewable resources, as many other combinatorial problems, gets such large dimensions
that it is quite difficult to apply solution procedures. In this paper, we describe
some powerful preprocessing techniques that reduce significantly the dimension of the
problems and therefore improve the efficiency of any algorithm used for solving them.
The paper shows the excellent results obtained by these techniques on a set of test
instance taken from the literature.
Keywords: Project Scheduling, Preprocessing, Partially Renewable Resources.
| Reference Key |
olagubel2009unrevista
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | Olaguíbel, Ramón Álvarez-Valdés;Crespo, Enric;Goerlich, José Manuel Tamarit;Juliá, M. Fulgencia Villa; |
| Journal | revista de matemática: teoría y aplicaciones |
| Year | 2009 |
| DOI |
DOI not found
|
| URL | |
| Keywords | Keywords not found |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.