Roof pre-blasting to prevent support crushing and water inrush accidents

Clicks: 306
ID: 31078
2012
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Star

Ranked #6 of 6 articles by views in international journal of mining science and technology

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
Support crushing and water inrush when mining under an unconsolidated confined aquifer in the Qidong Coal Mine was prevented by roof pre-blasting. The mechanism and applicable conditions for this method have been studied. The results show that when an overburden structure that may cause support crushing and a water inrush accident exists the weakening of the primary key stratum, which thereby reduces its weighting step, roof pre-blasting is both feasible and effective. If the position of the primary key stratum can be moved upward to exceed 10 times the mining height the possibility of support crushing and water inrush disaster caused by key stratum compound breakage will be lowered. The overburden structure of the number 7121 working face was considered during the design of a technical proposal involving roof pre-blasting. After comprehensively analyzing the applicability of roof pre-blasting the resulting design prevented support crushing and water inrush disasters from happening at the number 7121 working face and laid a solid foundation for mining safely. Keywords: Unconsolidated confined aquifer, Support crushing and water inrush, Roof pre-blasting, Key stratum
Reference Key
wang2012roofinternational Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors Wang, Xiaozhen;Xu, Jialin;Zhu, Weibing;Li, Yingchun;
Journal international journal of mining science and technology
Year 2012
DOI
DOI not found
URL
Keywords Keywords not found

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.