Impact Analysis of Sand Dredging from Alluvial Tidal River
Clicks: 162
ID: 29040
2018
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Steady Performance
67.9
/100
162 views
131 readers
Trending
AI Quality Assessment
Not analyzed
Readership in this journal
SteadyRanked #156 of 271 articles by views in e3s web of conferences
Most read
Least read
Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 271 in total.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
The Government of Bangladesh has planned to make a large build up area (BUA) in a newly developed sedimentary point bar (locally known as ‘Char’) at Lebukhali along the northern bank of Payra river in the southern part of the country. From a study it was revealed that, this sedimentary bar has to be raised by 3.45 meters from MSL to keep it free from any extreme events (like tidal and storm surge effects) for 100 years return period. Accordingly, it was planned to collect the required filling material (estimated 57.6 million m3 of sand/soil) by dredging the same river bed. In Bangladesh dredging of river is very popular and widely undertaken to collect filling and construction material, but its adverse impact on river bed, bank and adjacent areas are hardly probed. This study aimed at analyzing the adverse impacts of dredging from Payra River bed. Four alternative sand bars have been identified as dredging area at varying distances located both upstream and downstream of the proposed site. The dredging impacts were analyzed for different boundary conditions. The study is based on physical survey (topographic and bathymetric surveys), historical data and numerical model analysis. Numerical model is applied through Delf 3D to investigate the impact on flow parameters: flood depth and velocity magnitude. Continuous field visit and observations were made through last one year to observe real impact. The analysis revealed that dredging of any of the bars have resulted changes in flow field. The distance of dredging point does not control the flow field rather the dredging volume, depth and upstream conditions determine the effect on bank erosion. As such, the dredging locations have been prioritized considering the least possible effects on river bank erosion and founded that little erosion is taking place for both upstream and downstream region. However, the long term impacts in other areas of the river need to be investigated as the time pass.
| Reference Key |
kabirul2018impacte3s
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | Kabirul, Islam Md;Numan, Al Kibriya;Maruf, Dustegir Md.; |
| Journal | e3s web of conferences |
| Year | 2018 |
| DOI |
DOI not found
|
| URL | |
| Keywords | Keywords not found |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.