Project cost estimation techniques used by most emerging building contractors of South Africa

Clicks: 318
ID: 28969
2012
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Steady

Ranked #2 of 21 articles by views in acta structilia

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
This article investigates newly emerging building contractors of South Africa who are expected to survive by projects obtained mainly through tendering. Some of these contractors fail even before obtaining the first tender while many fail in the first three years of their formation. The research population used was restricted to formally registered businesses found at the time in the register of the Construction Industry Development Board (cidb). The population of 792 businesses, registered as Grade 5 class, consisted of five distinct types of contractors, general builders, civil engineers, electricians, mechanical builders and other sundry players. A sample of 160 was used which is approximately 20% of the population. The literature was reviewed on tendering and related aspects: competitive bidding, estimating activities, pricing a tender, and evaluating a tender. The research tool used was a questionnaire, which investigated biographical and company information, proposal management and estimation, programming and scheduling, estimating strategies, understanding of basic cost concepts, project risk management, pre-tender internal price evaluation, and tender submission. Findings of this research revealed that South African emerging contractors showed inadequacies and variations in cost concepts, scheduling tools, risk management and tender price estimation. They also lacked essential resources and skills for competing for tenders. Emerging contractors are advised to use consultants to assist them and/or subcontract to established contractors with a reputable history. They should use these opportunities to learn superior estimation methods (which are also more complex) and apply them to improve their own tendering practices.
Reference Key
seeletse2012projectacta Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors Seeletse, Solly;Ladzani, Watson;
Journal acta structilia
Year 2012
DOI
DOI not found
URL
Keywords Keywords not found

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.