An analysis of the problems on the reporting of accomplishment of infrastructure projects in the DPWH
Clicks: 1
ID: 287284
2020
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
0.0
/100
1 views
0 readers
AI Quality Assessment
Not analyzed
Readership in this journal
Ranked #3,555 of 3,757 articles by views in Malay Journal
Most read
Least read
Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 3,757 in total.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
Project monitoring is an activity that involves a continuous and systematic observation and checking of the current state of a project. However, in the Philippines, COA reports in recent years revealed that there were deficiencies worth billions of pesos in some projects of the DPWH that are caused by poor monitoring practices. One cause of these problems is the chronic misreporting of the accomplishment of projects. This practice has been rampant in the DPWH until now, despite the continuous recommendations from experts and other agencies of the government. The objective of this study is to find the reasons for the persistent problem of misreporting of accomplishment of projects in the DPWH with the use of Williamson’s Four Levels of Institutional Analysis. The source of primary data is collected from participant observation of the researcher and in-depth interviews of the engineers in the DPWH. Evidence using the framework revealed that project monitoring has problems at all levels. The first level emphasizes embeddedness of an institution. It was discovered that bloating of accomplishment of projects and corruption had already been part of the norms in the DPWH. These informal institutions evolved and remained beneath the many changes in formal institutions. The second level of institutional analysis is about the institutional environment or the formal rules of the game. This level exposes problems in manpower in the implementing offices of DPWH – Region I which affect the accuracy of data reflected in PCMA. Adding to this are policies of the DPWH that negatively affect the effectiveness of the use of PCMA. It was also discovered data validation, which ensures the correctness of data in PCMA, is not frequently conducted and has no specific guidelines. The third level, institutions of governance (play of the game), shed the light on problems in rule enforcement. The mutual relationship among the engineers and the contractors resulted in a systematic misreporting of projects in the IOs. The frequent non-implementation of sanctions among the engineers promotes misreporting of accomplishment of projects with minimal risks. The last level focuses on individual actors. This shows the problems on the basis of incentives in relation to the physical and financial targets of the agency and the lack of accountability in project monitoring. The findings of this study can be used in the formulation, implementation, and further improvements of policies among the agencies of the government, especially in the DPWH.
| Reference Key |
persistent_1760661131_68f18e8b2257c
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | Cunanan, Paul Justine S. |
| Journal | Malay Journal |
| Year | 2020 |
| DOI |
DOI not found
|
| URL | |
| Keywords | Keywords not found |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.