A vessel scheduling problem model considering multi-waterway assignment, anchorage queueing, and berth allocation

Clicks: 2
ID: 286332
2022
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Steady

Ranked #3,035 of 3,757 articles by views in Malay Journal

Most read Least read

Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 3,757 in total.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
The maritime sector is the focal and more practical transportation mode of bulk goods as sea freight services have considerably lower transportation costs in terms of long-distance service with high load capacity. The trade of goods supports global economic development, and thus follows the nation’s Gross Domestic Product (GDP). Any delay brought by bottlenecks in the port operations due to limitation of port resources affects its efficiency and the country’s trade competitiveness. Additional resources follow a huge investment to increase the efficiency of the port terminals. As delay plays a major role in port efficiency, such propels various researches regarding port scheduling to minimize the total completion time given the limitations in port resources. In port operations, a vessel undergoes four (4) key stages such as the inbound passage in the waterway, anchorage queueing, berth assignment, and outbound passage. Based on the existing literature, these stages are often resolved independently neglecting the element of interdependence amongst the stages. That is, a bottleneck in the berthing stage affects the traversing vessels in the waterway, the vessels waiting in open waters with respect to vessels’ Estimated Time of Arrival (ETA), and the number of vessels waiting at anchorage. Multi-waterways with the consideration of safety distance were not also explored as ports tend to divide territorial waters into several fairways to handle multiple simultaneous vessels while maximizing their natural resources (territorial waters). Furthermore, to the best of the author’s knowledge, the anchorage stage is not included in the system analysis of existing studies. Based on the limitations of the present literature, a mathematical model was developed to minimize the total completion time of vessels under schedule by considering multi-mode waterways assignment, waiting time in anchorage, and berth allocation while exploring traffic capacity, anchorage capacity, and berth spatial constraints. The mathematical model was formulated and translated into programming language using Python accompanied by Gurobi Optimizer. A base run for a small-scale problem of 10 vessels was conducted to validate the formulated model, and the results showed that the vessels are not allowed to start if the waterway, anchorage, and berth are concurrently busy showing the interdependence of each stage. The waterway that is most utilized is the one with a shorter travel duration but with smaller traffic capacity in both incoming and outgoing passages. Once anchorage was reached, the vessel is either assigned to an eligible berth, concerning spatial capacity, or waiting in anchorage.
Reference Key
persistent_1760658258_68f18352e4184 Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors Magno, Darlyn Jasmin A.
Journal Malay Journal
Year 2022
DOI
DOI not found
URL
Keywords Keywords not found

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.