Development of the quality plan and standard operating procedure for tower retrofitting
Clicks: 1
ID: 285135
2022
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
0.0
/100
1 views
0 readers
AI Quality Assessment
Not analyzed
Readership in this journal
Ranked #2,223 of 3,757 articles by views in Malay Journal
Most read
Least read
Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 3,757 in total.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
This paper focuses on assessing and developing the Tower Retrofitting procedure of Ericsson Telecommunications, Philippines. It is one of the leading service providers of telecommunication infrastructure in Asia. The Intern was able to identify the common problems encountered during Tower Retrofitting implementation through the use of quality procedure techniques and checking points.
As observed, these significant concerns were identified and analyzed in terms of their root cause. Control points were then established in the processes involved to minimize, if not eliminate, the recurrence of these conflicts. Upon the identification of the root cause of the problem, it was determined that there is no standard operating or quality procedure that would consistently ensure the quality and process of tower retrofitting. Thus, an efficient Tower Retrofitting flow and a detailed standard operating procedure applied to the current Tower Retrofitting system were developed. This approach involves an established flowchart for common reference and faster processing of documents aligned with the digitization of the current system due to the COVID-19 pandemic.
The consistent implementation and follow-through of the proposed Tower Retrofitting Flow and Standard Operating procedures were constructed to improve the company's work quality and strengthen its clients' deliverables within the schedule and allotted budget.
| Reference Key |
persistent_1760654727_68f1758745852
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | Abrazaldo, Rebeccah B. |
| Journal | Malay Journal |
| Year | 2022 |
| DOI |
DOI not found
|
| URL | |
| Keywords | Keywords not found |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.