Project performance review using forensic schedule analysis methods
Clicks: 2
ID: 285131
2023
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Steady Performance
0.3
/100
2 views
0 readers
AI Quality Assessment
Not analyzed
Readership in this journal
SteadyRanked #1,545 of 3,757 articles by views in Malay Journal
Most read
Least read
Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 3,757 in total.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
The construction industry has been behind compared to other industries in maximizing the use of its vast data assets for operational advantage. The company involved in this practicum requires regular enhancement of its policies and processes but lacks a systematic method to generate data-driven insights from previous projects. This paper addresses this gap by proposing a framework that integrates forensic schedule analysis (i.e., as-built versus as-planned method) and earned value analysis (EVA) to analyze project performance. The framework was applied to a case study of two school building projects. A root cause analysis was conducted to identify the reasons of project delays as well as the key success factors for completing the project on time. Results show that contractor’s financial capacity played a critical role in construction contract execution especially during force majeure events such as a pandemic. Based on the findings, recommendations are proposed to improve delay remedies, guidelines during force majeure events, project monitoring strategies, contractor evaluation, payment schemes, insurance covers, and material delivery requirements.
| Reference Key |
persistent_1760654715_68f1757bdf1b2
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | Galimba, Jamiel D. |
| Journal | Malay Journal |
| Year | 2023 |
| DOI |
DOI not found
|
| URL | |
| Keywords | Keywords not found |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.