Application of Sizing Estimation Techniques for Business Critical Software Project Management
Clicks: 63
ID: 282182
2014
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Popular Article
18.6
/100
63 views
22 readers
AI Quality Assessment
Not analyzed
Readership in this journal
PopularRanked #449 of 803 articles by views in arXiv
Most read
Least read
Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 803 in total.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
Estimation is one of the most critical areas in software project management
life cycle, which is still evolving and less matured as compared to many other
industries like construction, manufacturing etc. Originally the word
estimation, in the context of software projects use to refer to cost and
duration estimates only with software-size almost always assumed to be a fixed
input. Continued legacy of bad estimates has compelled researchers,
practitioners and business organizations to draw their attention towards
another dimension of the problem and seriously validate an additional
component, viz. size estimation. Recent studies have shown that size is the
principal determinant of cost, and therefore an accurate size estimate is
crucial to good cost estimation. Improving the accuracy of size estimates is,
therefore, instrumental in improving the accuracy of cost and schedule
estimates. Moreover, software size and cost estimates have the highest utility
at the time of project inception, when most important decisions (e.g. budget
allocation, personnel allocation, etc). are taken. The dilemma, however, is
that only high-level requirements for a project are available at this stage.
Leveraging this high-level information to produce an accurate estimate of
software size is an extremely challenging and high risk task. This study
acknowledges the presence and effect of risk in any software estimate and
offers pragmatic strategies for risk mitigation.
| Reference Key |
beg2014application
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | Parvez Mahmood Khan; M. M. Sufyan Beg |
| Journal | arXiv |
| Year | 2014 |
| DOI |
DOI not found
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.