Application of Sizing Estimation Techniques for Business Critical Software Project Management

Clicks: 63
ID: 282182
2014
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Popular

Ranked #449 of 803 articles by views in arXiv

Most read Least read

Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 803 in total.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
Estimation is one of the most critical areas in software project management life cycle, which is still evolving and less matured as compared to many other industries like construction, manufacturing etc. Originally the word estimation, in the context of software projects use to refer to cost and duration estimates only with software-size almost always assumed to be a fixed input. Continued legacy of bad estimates has compelled researchers, practitioners and business organizations to draw their attention towards another dimension of the problem and seriously validate an additional component, viz. size estimation. Recent studies have shown that size is the principal determinant of cost, and therefore an accurate size estimate is crucial to good cost estimation. Improving the accuracy of size estimates is, therefore, instrumental in improving the accuracy of cost and schedule estimates. Moreover, software size and cost estimates have the highest utility at the time of project inception, when most important decisions (e.g. budget allocation, personnel allocation, etc). are taken. The dilemma, however, is that only high-level requirements for a project are available at this stage. Leveraging this high-level information to produce an accurate estimate of software size is an extremely challenging and high risk task. This study acknowledges the presence and effect of risk in any software estimate and offers pragmatic strategies for risk mitigation.
Reference Key
beg2014application Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors Parvez Mahmood Khan; M. M. Sufyan Beg
Journal arXiv
Year 2014
DOI
DOI not found
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.