Design and performance of a coarse media, high hydraulic load polishing wetland for steel industry wastewater.

Clicks: 247
ID: 28196
2019
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Popular

Ranked #36 of 69 articles by views in water science and technology : a journal of the international association on water pollution research

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
This paper presents the design of a constructed wetland (CW) system in an area with limited land availability, resulting in high hydraulic loads. The CW was constructed to act as a buffering/ polishing step after stabilization ponds for steel industry wastewater post-treatment. A pilot test with two different filter media (50-100mm vs 40-60mm diameter) indicated that a flow rate increase from 49.5 m/h to 122.4 m/h would lead to a head loss increase from 2.9cm to 8.7cm, and more than double that for the finer gravel. This was substantially higher than the calculated theoretical values, though the relation with flow rate was similar. Four full scale wetland cells (CW1, CW2, CW3 and CW4) were constructed using the coarser gravel. A design value of total head loss of 1.01m over the total system length, with a design flow of 36,000 m/day, was expected based on pilot test results. During the first operation year (September 2017 to July 2018), the pond-CW system has received wastewater already meeting required discharge standards. The effluent from the CWs had consistently lower concentrations of all measured variables, and met the predicted values for biochemical oxygen demand (BOD), total nitrogen (TN) and NH-N. Highest removal efficiencies were achieved for NH-N (>90%), Mn (>60%) and Fe (45%) with removal efficiencies for TN (14%), BOD and chemical oxygen demand (COD) (around 30%). Concentrations of phenol, CN and Cr were below 10, 4 and 3μg/l, respectively, in in- and outflows. An appreciated benefit of the wetland was the 'green element' in the industrial landscape.
Reference Key
nguyen2019designwater Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors Nguyen, Viet Anh;Nguyen, Minh Phuong;Tonderski, Karin;Thi, Hai Do;Thi Kim Bui, Anh;
Journal water science and technology : a journal of the international association on water pollution research
Year 2019
DOI
10.2166/wst.2019.244
URL
Keywords Keywords not found

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.