Identification of Annual Work Hour Elements in Production Cycle and Experimental Assessment of Flow Coefficient and Optimal Series
Clicks: 227
ID: 258328
2019
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Emerging Content
30.0
/100
227 views
43 readers
AI Quality Assessment
Not analyzed
Readership in this journal
EmergingRanked #10 of 10 articles by views in tehnički vjesnik
Most read
Least read
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
In the metalwork production a large part of gross domestic product is being achieved by automating the production in large factories, the finalists, but even a larger part comes from subcontractors and companies that have small-scale and mass production of maintenance elements and other services. Therefore, the production with higher degree of stochastics and organization mostly occurs during the production, and it happens, but to a lesser extent, that everything is planned and set in advance, and according to those facts this survey is going to analyze one of the most important production indicators - the production cycle. In this paper we are experimentally demonstrating the original stochastic method of determining 10 different production cycle working hours, and production cycle itself is determined out of factory driving records. The research also enables determining the flow coefficient which represents the function between the size of the series and technological or real time of the production cycle. Within the framework of a broader research we are contributing results of four years long record, from 2011 to 2014 for a large company with high level of organization. The production cycle per years (2011-2014) amounts to 326, 233, 248 and 236 minutes, while the flow coefficient is Kp=(277/x+0.24) the one that enables and experimentally determines optimal series which is in total 9 items for the company in question.
| Reference Key |
stanisavljev2019identificationtehnicki
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | Stanisavljev, Sanja;Klarin, Milivoj;Spasojević-Brkić, Vesna;Radojičić, Miroslav;Vesić-Vasović, Jasmina; |
| Journal | tehnički vjesnik |
| Year | 2019 |
| DOI |
DOI not found
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.