two-agent single-machine scheduling with resource-dependent starting times

Clicks: 5
ID: 246632
2013
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Steady

Ranked #1,073 of 1,093 articles by views in journal of power sources

Most read Least read

Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 1,093 in total.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
We consider several two-agent scheduling problems with resource consumption on a single machine, where each of the agents wants to minimize a measure dependent on its own jobs. The starting time of each job of the first agent is related to the amount of resource consumed. The objective is to minimize the total amount of resource consumption of the first agent with the restriction that the makespan or the total completion time of the second agent cannot exceed a given bound U. The optimal properties and the optimal polynomial time algorithms are proposed to solve the scheduling problems.
Reference Key
liu2013mathematicaltwo-agent Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Peng Liu;Xiaoyu Tian
Journal journal of power sources
Year 2013
DOI
10.1155/2013/805261
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.