safety risk management based on fuzzy logic at underground projects

Clicks: 291
ID: 246252
2017
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Steady

Ranked #3 of 6 articles by views in 2017 10th international conference on contemporary computing, ic3 2017

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
Introduction: Organizations, manufacturing and non-manufacturing companies, and development units are always associated with incidents and the need for proper risk assessment. One of these is the process of constructing subwayways that, given its nature, require special attention and the occurrence of accidents is always there. But as risk definition is clear, risk is always associated with uncertainty. Accordingly, it should be noted that the performance of risk assessment calculations should be consistent with the principles that could cover this uncertainty. One of the most prominent methods in this field is the use of fuzzy logic fuzzy calculations that can provide an appropriate response, if accompanied by expert opinions, to estimate the probable risk of accidents. Methods: In this paper, firstly, identification of the existing occupational hazards in the construction of subway projects was carried out. Then, prioritization and ranking of identified hazards were performed based on the degree of importance of the fuzzy hierarchy analysis method, and finally using the method of analysis and the fuzzy hierarchical analysis of ranking has been done on the safety risks of the subway construction. Results: The results show that the main risk factors of these operations are priorities, including depletion during drilling, the collision of machinery with manpower is associated with hazards associated with shotcrete and surface water and groundwater operations. Conclusion: In the present article, a new model was developed to calculate the probability of occurrence of the event, which so far has not been addressed in other studies. Finally, effective measures can be taken to reduce the risk of a project by eliminating the high risk factors.
Reference Key
taherkhani2017muhandis-isafety Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Farhad Taherkhani;Mahnaz Mirzaebrahim tehrani;Saeed Malmasi
Journal 2017 10th international conference on contemporary computing, ic3 2017
Year 2017
DOI
DOI not found
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.