does renewable energy still need subsidy

Clicks: 185
ID: 245687
2017
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Popular

Ranked #16 of 28 articles by views in Multimedia tools and applications

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
For many decades, it has been stated that renewable energy, RE, needs subsidy, otherwise it will not be able to compete or sustain. For a certain level, this statement was valid. In this period, the investment costs for both wind and photovoltaic, PV, were high. In other words, production costs of both of them reached around 7.0 and 13.0 Cent US$ per kWh. On the other hand, oil and natural gas, NG, prices were low; i.e. less than US$ 30.0 per oil barrel and around US$ 4.0 per million British thermal unit, MMBTU, of NG. Also, policies of promoting RE were limited; almost there are two main policies, Feed-in-Tariff, FiT, in limited developed countries and international tenders. As a result, investment in RE was usually led by developed countries and minor share from the developing countries. This was the scene of RE before around 10 years. Nowadays, the scene of RE totally differs. Starting from the policies side, through auctions in both solar and wind energies, new records of prices have been reached. In numbers, in the field of wind energy Morocco and Egypt already signed contracts with prices lower than 4.0 US$ Cents/kWh. For PV, there is a dramatic devaluation in the prices. Now we are speaking for less than 0.7 million US$ per MW for turnkey projects. As a result, during the last couple of years, the global RE market witnessed a bundle of an outstanding prices, El-Sewihan Project at Abu Dhabi, 2.42 US$ Cent/kWh. Mexico and Dubai projects, 3.6 and 3.0 US$ Cent/kWh. Few days ago, Dubai Electricity and Water Authority, DEWA, received $9.45 cents per kilowatt-hour for its 200MW concentrated solar power (CSP) plant. All these figures, and others, gave us important messages; 1) Despite low prices of oil and NG, RE is able to compete and offer outstanding prices, 2) Wind and PV technologies do not need any kind of subsidy, rather than they need a real free market to compete, 3) CSP is a low hanging fruit and it will witness a frog-leap during the coming couple of years, 4) Even CSP still high, compared with both PV and wind, but is a dispatchable energy. So, it is a game changer. 5) There is a need for more R&D efforts in storage technology. 6) The role of small-scale applications; i.e. biomass and PV, still need further development in the developing countries. 7) Most of the outstanding recent prices have been fulfilled by developing countries, which means that their role in promoting RE applications, grow year by year.
Reference Key
khayat2017renewabledoes Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Dr. Eng. Mohamed Mostafa El Khayat
Journal Multimedia tools and applications
Year 2017
DOI
10.21622/RESD.2017.03.3.241
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.