Analysis of construction dynamic plan using fuzzy critical path method
Clicks: 243
ID: 24181
2014
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Star Article
72.5
/100
243 views
162 readers
Trending
AI Quality Assessment
Not analyzed
Readership in this journal
StarRanked #3 of 4 articles by views in tehnika
Most read
Least read
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
Critical Path Method (CPM) technique has become widely recognized as valuable tool for the planning and scheduling large construction projects. The aim of this paper is to present an analytical method for finding the Critical Path in the precedence network diagram where the duration of each activity is represented by a trapezoidal fuzzy number. This Fuzzy Critical Path Method (FCPM) uses a defuzzification formula for trapezoidal fuzzy number and applies it on the total float (slack time) for each activity in the fuzzy precedence network to find the critical path. The method presented in this paper is very effective in determining the critical activities and finding the critical paths.
| Reference Key |
v2014analysistehnika
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | V., Kurij Kazimir;V., Milajić Aleksandar;D., Beljaković Dejan; |
| Journal | tehnika |
| Year | 2014 |
| DOI |
DOI not found
|
| URL | |
| Keywords | Keywords not found |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.