Analysis of construction dynamic plan using fuzzy critical path method

Clicks: 243
ID: 24181
2014
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Star

Ranked #3 of 4 articles by views in tehnika

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
Critical Path Method (CPM) technique has become widely recognized as valuable tool for the planning and scheduling large construction projects. The aim of this paper is to present an analytical method for finding the Critical Path in the precedence network diagram where the duration of each activity is represented by a trapezoidal fuzzy number. This Fuzzy Critical Path Method (FCPM) uses a defuzzification formula for trapezoidal fuzzy number and applies it on the total float (slack time) for each activity in the fuzzy precedence network to find the critical path. The method presented in this paper is very effective in determining the critical activities and finding the critical paths.
Reference Key
v2014analysistehnika Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors V., Kurij Kazimir;V., Milajić Aleksandar;D., Beljaković Dejan;
Journal tehnika
Year 2014
DOI
DOI not found
URL
Keywords Keywords not found

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.