PENGEMBANGAN ALGORITMA PENJADUALAN PRODUKSI JOB SHOP UNTUK MEMINIMUMKAN TOTAL BIAYA EARLINESS DAN TARDINESS

Clicks: 265
ID: 24128
2005
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Star

Ranked #2 of 2 articles by views in jurnal ilmiah teknik industri

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
This paper develops job shop production scheduling using Non Delay algorithm through forward and backward-forward algorithm to minimize total earliness and tardiness costs. Backward approach has some disadvantages, such as, if the job is scheduled in backward, there is a possibility that the infeasible situation occurs, in which the job is scheduled at t<0. This paper used hypothetic data generated randomly. This job shop scheduling algorithm development was validated using LINDO software to check the effectiveness heuristic method, compared with the optimation method. The validation proves that the result of backward-forward scheduling method is better than the result of forward scheduling method.
Reference Key
dewi2005pengembanganjurnal Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors Dewi, Dian Retno Sari;
Journal jurnal ilmiah teknik industri
Year 2005
DOI
DOI not found
URL
Keywords Keywords not found

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.