installation, commissioning and tests of four fast switching units of up to 20 ka for the jt-60sa nuclear fusion experiment

Clicks: 156
ID: 239387
2018
Article Quality & Performance Metrics
Overall Quality Improving Quality
0.0 /100
Combines engagement data with AI-assessed academic quality
AI Quality Assessment
Not analyzed
Abstract
The nuclear fusion project JT-60SA is presently under construction in Naka (Japan) as a joint collaboration between Europe and Japan, within the framework of the Broader Approach Agreement. According to such agreement, the various JT-60SA systems are supplied by European and Japanese institutions. In particular, the Italian Agency ENEA was in charge for the procurement of the four Switching Network Units (SNUs) for the JT-60SA Central Solenoid (CS). The main SNU function is to interrupt a DC current up to 20 kA in a short time (less than 1 ms) in order to produce an overvoltage of up to 5 kV, crucial to generate and sustain the fusion plasma. The SNU design, manufacturing and factory test activities have been completed in 2016. After the delivery in Naka, the four SNUs have been installed and successfully commissioned in 2017. After an overview on the main technical characteristics of the SNUs and the key aspects of their design, this paper describes the activities performed on-site, highlighting the results obtained during the final acceptance tests and comparing them with the design simulation and the factory test results.
Reference Key
lampasi2018energiesinstallation, Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Alessandro Lampasi;Filippo Burini;Giuseppe Taddia;Sandro Tenconi;Makoto Matsukawa;Katsuhiro Shimada;Luca Novello;Antti Jokinen;Pietro Zito
Journal acs combinatorial science
Year 2018
DOI
10.3390/en11040996
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.