contractor work preparation process improvement using lean six sigma

Clicks: 204
ID: 227459
2016
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Steady

Ranked #20 of 26 articles by views in Social psychiatry and psychiatric epidemiology

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
To ensure the health and safety of their workforce and protection of their assets and the environment, a global oil and gas company operating in Indonesia requires comprehensive identification and evaluation of job hazards that were included in work permitting process prior work execution in the field. Based on 20 data points obtained in August 2013, start-working time for contractors who worked for Capital Project Management (CPM) Team in Facility B was in average at 09.05 a.m. The aim of this paper is to present how the firm implemented Lean Six Sigma to reduce non-added value activities while fulfilling to its safety requirements and to share lessons learned from practical and theory testing perspective. The methodology used is Lean Six Sigma’s DMAIC (Define, Measure, Analyze, Improve, Control) as mandated by the corporate policy of the firm. This research adopts a mix-methods approach, by using both qualitative and quantitative data. This study was a one year longitudinal study of the Lean Six Sigma implementation to improve contractors’ work preparation process. The improvement resulted in reduction of non-value added activities and successfully increased the available working time per day by 59.3 minutes in average. The results of this case study reconfirm Lean Six Sigma as a good management theory since it shows a consistency between the theory and the real practice in a global oil and gas company in Indonesia.
Reference Key
kusnadi2016southcontractor Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Asana Kusnadi;Gatot Yudoko
Journal Social psychiatry and psychiatric epidemiology
Year 2016
DOI
10.21002/seam.v10i1.5781
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.