unlicensed renewable energy generation: a review of regulation and applications in the context of turkey
Clicks: 192
ID: 226506
2015
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Emerging Content
30.0
/100
192 views
29 readers
AI Quality Assessment
Not analyzed
Readership in this journal
EmergingRanked #13 of 16 articles by views in physica status solidi (a)
Most read
Least read
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
Turkey has stipulated that renewable energy sources (RES) will have at least 30% share in electricity generation by 2023. To reach this target, a renewable energy promotion law (Law No. 5346) was enacted in 2005 and later amended in 2011. Through Law No. 5346, Turkey has launched a feed-in tariff (FIT) for RES-based electricity with additional premium for the use of local equipment. The FIT is guaranteed for 10 years from the date of operation and valid only for RES power plants commissioned between the 18th May, 2005 and the 31th of December 2020. In addition, RES power plants with a capacity of up to 1 MW are exempted from licensing and establishing legal entities. There is an increasing demand to install unlicensed RES generators, mostly solar power plants, all over the country. At least one consumption unit must be associated with an unlicensed power plant. Excess generation from unlicensed RES power plants is automatically priced at the FIT for 10 years. Except for the FIT mechanism, unlicensed generators have no options to sell unconsumed electricity in the electricity market. The main difficulties lie in limited connection possibilities, the selection of plant locations, and coordination among relevant authorities. Moreover, an awareness campaign would help people to better understand the related regulation and applications.
| Reference Key |
gozen2015internationalunlicensed
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;Mustafa GOZEN |
| Journal | physica status solidi (a) |
| Year | 2015 |
| DOI |
DOI not found
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.