a bee colony optimization approach for mixed blocking constraints flow shop scheduling problems

Clicks: 94
ID: 221153
2015
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Steady

Ranked #738 of 1,093 articles by views in journal of power sources

Most read Least read

Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 1,093 in total.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
The flow shop scheduling problems with mixed blocking constraints with minimization of makespan are investigated. The Taguchi orthogonal arrays and path relinking along with some efficient local search methods are used to develop a metaheuristic algorithm based on bee colony optimization. In order to compare the performance of the proposed algorithm, two well-known test problems are considered. Computational results show that the presented algorithm has comparative performance with well-known algorithms of the literature, especially for the large sized problems.
Reference Key
khorramizadeh2015mathematicala Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Mostafa Khorramizadeh;Vahid Riahi
Journal journal of power sources
Year 2015
DOI
10.1155/2015/612604
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.