integer 1/0 knapsack problem dynamic programming approach in building maintenance optimization
Clicks: 201
ID: 199131
2017
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Steady Performance
30.0
/100
201 views
22 readers
AI Quality Assessment
Not analyzed
Readership in this journal
SteadyRanked #3 of 10 articles by views in proceedings of the ieee international conference on systems, man and cybernetics
Most read
Least read
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
The most common problem in urban areas is the high public demand and the limited provision of housing. In meeting the needs of affordable housing for low income communities, the Government of Indonesia implements Rusunawa Project. Object of this research is Pandanarang Rusunawa. Rusunawa Pandanarang is one of the vertical housing in Cilacap that is facing deterioration issue and needs good maintenance management. This study aims at insetting priority and optimizing maintenance plan due to limited funds (limited budget) and the amount of damage that must be repaired.This study uses one of the optimization methods of Dynamic Programing on the application of Integer 1/0 Knapsack Problem, to determine an schedule the maintenance activities. The Criteria that are used such as: the level of building components damage and the level of occupants participation. In the first criterion, the benefit (p) is the percentage of damage that is fixed with the cost (w). While on the second criterion, the benefit (p) is the percentage of occupant participation rate on the maintenance activities with the cost (w). For the budget of Rp 125.000.000, 00, it was obtained from the simulation that the value of the optimum solution on the first criterion at the 7th stage of 71.88% with total cost Rp 106.000.000, 00. At the second criterion, the value of the optimum solution at the 7th stage of 89.29% with total cost Rp 124.000.000, 00.
| Reference Key |
fawzy2017internationalinteger
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;Viska Dewi Fawzy;Senot Sangadji;Sholihin As’ad |
| Journal | proceedings of the ieee international conference on systems, man and cybernetics |
| Year | 2017 |
| DOI |
10.20961/ijsascs.v2i1.16762
|
| URL | |
| Keywords | Keywords not found |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.