optimal management for waters for the production of electrical energy

Clicks: 67
ID: 196845
2015
Article Quality & Performance Metrics
Overall Quality Improving Quality
0.0 /100
Combines engagement data with AI-assessed academic quality
AI Quality Assessment
Not analyzed
Abstract

The hydropower management along a short-term planning horizon is a determinist problem, which consists in determining the amount of water to be discharged from each reservoir of the system over the defined planning horizon so that to meet the hourly load demand assigned previously. The prime objective here is to perform the operating policy with the lowest use of water; which is achieved by avoiding spilling and by maximizing the hydroelectric generation, besides satisfying all operating constraints. The maximization of electrical power production is achieved by maximizing the heads. Consequently, this allows maximizing the reservoirs content.

To solve to the deterministic hydropower management problem, we use the discrete maximum principle. While solving the equations relating to the discrete maximum principle, we use the gradient method. However, to treat equality constraints we use Lagrange’s multiplier method. To treat the inequalities constraints we use the augmented Lagrangian method. The developed algorithm gives a satisfactory solution for the problem and turns out to be very efficient.

Reference Key
bensalem2015journaloptimal Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;A. Bensalem;A. Oudai;A. El-maouhab;A. Bouhentala
Journal pure and applied chemistry
Year 2015
DOI
10.4314/jfas.v2i1.5
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.